|
|
| Once all of the piles have been driven, the tops are trimmed to approximately the same height with a chain saw. A surveyor's transit is used to set horizontal hangers on the poles. This level surface becomes the foundation upon which the floor joists will rest. |
|
| This near-water-level view illustrates how the double-level of perpendicular horizontal beams is used to create a very level finished dock. |