|
|
We use a custom built pile driver mounted on a barge to drive heavy, pressure-treated poles deep into the lake bed. |
|
A view from the water looking up: The massive weight used to drive the poles is a lead-filled steel cylinder weighing 570 pounds. A steel cap is placed over the top of the pole to protect it from splitting when the weight strikes it. |